Wrocław

2020


"Execution of construction works consisting in the construction of two discharge pipelines from the Polanka pumping station to the North collector in the J. Conrad-Korzeniowskiego coast in Wrocław"


The scope of the entire investment includes the following facilities and networks:

  • wastewater discharge pipeline T1 length L = 441.00m
  • wastewater discharge pipeline T2 length L = 439.70m
  • reinforced concrete connection chamber with dimensions of 4.86m/4.60m x 3.60m x 8.13m as
  • connection to the existing DN2000 collector
  • reinforced concrete expansion chamber with dimensions of 5.40m x 3.60m x 4.23m





  • Photo gallery