Szczecin

2022


"Modernization of the "Miedwianka" water main in Szczecin - Stage I and II" and "Modernization of the "Miedwianka" water main in Szczecin - Stage III"


Scope of the investment Stage 1:

  • assembly and disassembly of the temporary pipeline Dy 630mm PE , L=386,0m
  • disassembly of the DN1200 main pipeline, L=422,50m
  • construction of the target pipeline DN1000, L=422,50m

  • Scope of the investment Stage 2:
  • assembly and disassembly of the temporary pipeline Dy 630mm PE , L=586,9m
  • disassembly of the DN1200 main pipeline, L=562,0m
  • construction of the target pipeline DN1000, L=561,0m

  • Scope of the investment Stage 3:
  • assembly and disassembly of the temporary pipeline Dy 630mm PE , L=425m
  • disassembly of the DN1200 main pipeline, L=434,40m
  • construction of the target pipeline DN1000, L=705,0m